Kitchen Remodeling Process:
Initial
Consultation- Call us today or fill out the Request Estimate Form to request your free kitchen remodel/addition. Pricing
is not provided during your initial consultation. Kitchen remodeling can be pricy, so we do our best to provide a precise
quote for each customer. There is generally a 1-2 week period after the initial consultation before pricing is complete. During
your kitchen consultation we will determine what the the customer would like to accomplish with this remodel. From our experience
as a kitchen contractor, there are 2 general types of kitchen remodels:
1)Pull and Replace Kitchen Remodeling- This is the easiest way to get a new look for a lower cost.
These kitchen remodels usually include a new floor, cabinets, electrical fixtures, etc. The kitchen design in this type
of remodel is the exact same as is was before, it is simply all brand new and updated. With a pull and replace remodel
there are no electrical lines to move or pipes to replace, so the costs are generally lower than a custom kitchen
remodels when you are redesigning the space. These projects can range from $10K-$70K+ depending on kitchen cabinets
and other selections. This type of kitchen remodel usually takes 2-8 weeks. The size of the kitchen remodel can also
have a large impact on pricing and schedule. See bottom of page for more info on kitchen remodeling products.
2)Custom Kitchen
Remodeling- These kitchen remodels can be more like large kitchen renovations. Sometimes the kitchen design
can change dramatically. There are often walls that need to be removed, plumbing and electrical lines to be moved. A
significant amount of drywall installation and repair is often involved. There may even be an addition involved.
There is usually alot more labor and materials in this type of kitchen remodeling project. Costs for projects like this
can significantly vary based on the property. These projects are usually between $30K-$130K+ depending on
kitchen cabinets and other selections. A custom kitchen remodeling project usually takes 2-8 weeks. The size of
the kitchen remodel can also have a large impact on pricing and schedule. See bottom of page for more info
on kitchen remodeling services.